Showing posts with label Network. Show all posts
Showing posts with label Network. Show all posts

Friday, 4 September 2015

Framing Day 105 - More finalization

This is a range of pictures taken over the 4th, 5th and 6th of September.

All completed. I honestly do not remember what we'd asked for here (colour wise and if it's meant to be tiled).

The sub-board revealed.

Almost completed.

Galley completed. Space reserved for a second 60cm under bench oven.

Galley completed.

Walk in pantry. The bottom shelf still needs to be lifted 5-7cm. I'd specifically had it set to 500mm, not the normal 450mm. An easy fix.

The dwarf door leading to under the stairwell. Aka wine cellar!

The network hub termination points. A cabinet will be placed there.

The powder room looks complete.

Terrace almost finished.

Not sure if the two drainage points have been finished. Will have to make sure the render does not stain over time. The dwarf wall will help, as the amount of rain entering the terrace will be minimal.

We have a gas meter! Although, for the 500Mj, I'd expected it to be bigger.

I think the facade is complete.

The rain head and a sensor light (which I don't remember asking for).

Termite Protection.

Saturday, 29 August 2015

Framing Day 100 - Über Update

Well, we're up to the 100th day of post slab build, give or take a few days here and there. Meh.

Today I managed to take lots of pictures here and there as we walked around. I did not know it at the time (that it was the 100th day) however, it fits that there are lots of pictures for such a momentous day!

The termite protection has been put all around the house.

The short side of the galley. The tiler had left over tiles and suggested that we tile this bit to match the other side of the galley.

Tap is in.

Laundry

Laundry. Probably where an extra fridge or freezer (or both) will go.

Galley bench will need to be buffed.

Wall mount TV point.

Network, Foxtel and Antenna point.

WIR shelving.

WIR

Bathroom sink yet to be fitted out.

Guest suite bathroom.

Family room. The skirting boards have been left and we will fit them post handover once we've put our flooring in.

Place holder lights above the kitchen bench for the pendant lights we will be installing post handover.

The finished, painted repair work.

The theatre room.

The yet-to-be-stained stairwell.

PD's quality inspections have started. Either that or a hoarde of angry blue wasps has landed.

The modwood has been fitted into the terrace.


Master ensuite shower.

Spa in and tiled, the taps yet to be completed.

Room with a view.

Still waiting for the mirror.

Master bedroom. Hers.

Master bedroom. His.

Bathroom shower.

WIR shelving.

Door knobs yet to be added.

The Lego room!

Bathroom sink and cupboard.

A different bathroom shower.

CAT 1 toilet.

Another bathroom.

Heat lamps and exhaust fans fitted.

Found the man hole!

Awaiting final stain and clear coat.

The network bundle!

Inside view of the front door.