Today I managed to take lots of pictures here and there as we walked around. I did not know it at the time (that it was the 100th day) however, it fits that there are lots of pictures for such a momentous day!
The termite protection has been put all around the house. |
The short side of the galley. The tiler had left over tiles and suggested that we tile this bit to match the other side of the galley. |
Tap is in. |
Laundry |
Laundry. Probably where an extra fridge or freezer (or both) will go. |
Galley bench will need to be buffed. |
Wall mount TV point. |
Network, Foxtel and Antenna point. |
WIR shelving. |
WIR |
Bathroom sink yet to be fitted out. |
Guest suite bathroom. |
Family room. The skirting boards have been left and we will fit them post handover once we've put our flooring in. |
Place holder lights above the kitchen bench for the pendant lights we will be installing post handover. |
The finished, painted repair work. |
The theatre room. |
The yet-to-be-stained stairwell. |
PD's quality inspections have started. Either that or a hoarde of angry blue wasps has landed. |
The modwood has been fitted into the terrace. |
Master ensuite shower. |
Spa in and tiled, the taps yet to be completed. |
Room with a view. |
Still waiting for the mirror. |
Master bedroom. Hers. |
Master bedroom. His. |
Bathroom shower. |
WIR shelving. |
Door knobs yet to be added. |
The Lego room! |
Bathroom sink and cupboard. |
A different bathroom shower. |
CAT 1 toilet. |
Another bathroom. |
Heat lamps and exhaust fans fitted. |
Found the man hole! |
Awaiting final stain and clear coat. |
The network bundle! |
Inside view of the front door. |