Saturday, 29 August 2015

Framing Day 100 - Über Update

Well, we're up to the 100th day of post slab build, give or take a few days here and there. Meh.

Today I managed to take lots of pictures here and there as we walked around. I did not know it at the time (that it was the 100th day) however, it fits that there are lots of pictures for such a momentous day!

The termite protection has been put all around the house.

The short side of the galley. The tiler had left over tiles and suggested that we tile this bit to match the other side of the galley.

Tap is in.

Laundry

Laundry. Probably where an extra fridge or freezer (or both) will go.

Galley bench will need to be buffed.

Wall mount TV point.

Network, Foxtel and Antenna point.

WIR shelving.

WIR

Bathroom sink yet to be fitted out.

Guest suite bathroom.

Family room. The skirting boards have been left and we will fit them post handover once we've put our flooring in.

Place holder lights above the kitchen bench for the pendant lights we will be installing post handover.

The finished, painted repair work.

The theatre room.

The yet-to-be-stained stairwell.

PD's quality inspections have started. Either that or a hoarde of angry blue wasps has landed.

The modwood has been fitted into the terrace.


Master ensuite shower.

Spa in and tiled, the taps yet to be completed.

Room with a view.

Still waiting for the mirror.

Master bedroom. Hers.

Master bedroom. His.

Bathroom shower.

WIR shelving.

Door knobs yet to be added.

The Lego room!

Bathroom sink and cupboard.

A different bathroom shower.

CAT 1 toilet.

Another bathroom.

Heat lamps and exhaust fans fitted.

Found the man hole!

Awaiting final stain and clear coat.

The network bundle!

Inside view of the front door.

Saturday, 25 July 2015

Framing Day 76 - Internal Fit out and pull through

Now that the nice plaster has been painted, it's time we cut holes in it!

Heatlamps installed in the other bathrooms. We have SpeedHeat in-floor heating in the master ensuite.


Heating return vent.






Saturday, 4 July 2015

Framing Day 61 - Stairs in, Cabinetry In, Doors on!

It did not take long for the stairs to be put into place! The cabinetry was also put in.

The only change we made post site start, was to have the laundry door hung the other way (a zero cost variation). Our Site Supervisor was ok with this. Needless to say, the door was hung the wrong way. The door frame is made in the factory (they do not do it on site), and despite the many assurances to the contrary, it was hung the wrong way. I informed David, and I got "Oh No! You're kidding me!" Nope.







The missing panel was damaged and PD picked it up, and ordered a new one.




Now that's a galley sink! The AFA-768!

Not quite like the world of style.

A view of the dwarf door under the stairwell.

The door was still hung the wrong way.

The lounge has been walled in to make a theatre room. We've made a feature of the plumbing stack.

We have front doors!

I love that stairwell!

And it's detail.

The view from the terrace.


Showing the three coats of render.

Why is this not finished flush, why around the corner?