All completed. I honestly do not remember what we'd asked for here (colour wise and if it's meant to be tiled). |
The sub-board revealed. |
Almost completed. |
Galley completed. Space reserved for a second 60cm under bench oven. |
Galley completed. |
Walk in pantry. The bottom shelf still needs to be lifted 5-7cm. I'd specifically had it set to 500mm, not the normal 450mm. An easy fix. |
The dwarf door leading to under the stairwell. Aka wine cellar! |
The network hub termination points. A cabinet will be placed there. |
The powder room looks complete. |
Terrace almost finished. |
We have a gas meter! Although, for the 500Mj, I'd expected it to be bigger. |
I think the facade is complete. |
The rain head and a sensor light (which I don't remember asking for). |
Termite Protection. |