Framing Day 110 - Lights! Garage Doors! Storm Water!

As we approach handover, the nature of the work performed gets smaller; lots of small fiddly jobs. Except for the cleaning! The cleaners had been through the house this week.

The garage doors had been fitted!

The storm water also appears to have been connected to the Legal Point Of Discharge (LPOD).

The power had also been connected to the internals of the house! WE HAVE LIGHTS!


Actually, I' not sure what this is for.


We have power! Lights! Camera! Action!

You can see where the repair was made.

Does this need to be repaired?

It apears that the storm water has been connected.