Saturday, 1 August 2015

Framing Day 80 - Waterproofing, Painting, Tiling and Wiring!

It had been a busy two days. Not only could I get a decent look at the waterproofing (yes, and my footprints!), the tiles had been delivered! I'd been worried all along that the lovely tiles we'd ordered were no longer available. We had one switch performed on us, but I was worried that the lovely textured (not flat) tile for the splashback and galley would be added to the "no longer available" list. Thankfully, that was not the case! Some of the wiring had also started to have been pulled through.
Some of this has actually been tidied up.



One of the upstairs bathrooms waterproofed. All of them were done.

Tiles have arrived!

Wiring starting to come through.

The painting continues.