Saturday 16 May 2015

Framing Day 25 - Heating and Ducting

The heater has also been installed, and the duct work has begun. The roof space that once looked massive, now looks very cramped. The roof space needs to hold ducts for two evaporative cooling systems as well as the heating ducts.

The heater is in place. Note the Anti-theft warning.




No comments:

Post a Comment