Monday 23 March 2015

Site Cleanup

Given all of the rock, and the left over concrete (from the cleaned pump lines), I was wondering when they'd clean it all up before the drainer had to start their job.

My mum lives a few hours away, and she happened to be down and popped in to see me. She had also not seen the block, so I took her around to see it.

When we arrived, we were pleasantly surprised to find that the site was being scraped clean!

A small digger. It just managed to move the larger rocks. I want one!!!
The man driving the digger was nice, he also said that they did all of the PD work in the area. He also said that he'd managed to fill this truck twice!!! He may have needed a third trip, as he may not have had space for his digger to go in the rear trailer. The type of fill (clean dirt or with broken glass, rock etc left over from the demolition) determines where the loads of rubbish go. In this case, it was a 45 minute trip to empty the loads; that's where the day goes!

At least two of these loads!
So in a few days, we've gone from this:

Before.




To this:

After.

Now, at least the drainer will not have to dodge all of the surface rocks. He's going to have a hard enough time with the underground ones!