This morning I went to check the block to see what the status of the drainage was.

To my surprise, we had a second, larger digger on site. This one was brought in to break the rocks up so that they could be actually picked up and put into a truck to take them away!

It had this jack hammer attached to it.

The jack hammer.


It makes pretty neat work of the rocks.

The split rocks.

Unfortunately, I did not have my boys with me, so I had to take this instead.



I was going to name this blog post "Ten years of hard labour", as that is about the time I think that it would have taken me to breakup and move these rocks by hand! :)